Have you noticed all these precautions for rock slab paving?
Nov 22,2023

First of all, we must understand the basic process flow of the whole rock slab paving installation: leveling and treatment of the base layer → elastic line positioning, plate cutting → adhesive preparation → adhesive construction → back coating of the rock slab → checking whether it is full of slurry → fixing the rock slab on the wall → vibrating and leveling → rock slab leveling → surface cleaning and protection → caulking treatment.

Before paving, the following special large rock slab paving tools should be prepared, including but not limited to: industrial-grade ceramic tile suction cup, large-size moving bracket, light plastic hammer (ceramic tile vibrator), guiding rule, steel screed knife, ash key (several), ceramic tile leveling device, sponge caulking scraper, cleaning sponge, etc.

Rock plate paving construction, the need to use professional binder, rather than the traditional cement, the use of binder requires a low shrinkage ratio, long opening time, strong bonding force.

Adhesive paving thickness to 5-7 for the appropriate, too thick easily lead to late fall off, can be used together with the adhesive.

Correctly use the tooth-shaped knife, distinguish between scraping wall and scraper, do not lift the rock plate by hand or use the suction cup of the non-pressure valve on the market, but use the vacuum suction cup plate lifter.

The base surface should be flat, clean, strong, no dust, no water, grease and other dirt and other loose objects.
The surface of old concrete and old plastering can be cleaned with industrial detergent or degreasing agent, then rinsed with high-pressure faucet, and the surface can be dried for 24 hours before operation.

The new concrete shall be cured for at least 28 days before the slabs are laid and the newly plastered surface shall be cured for at least 7 days before the slabs are laid. (Pay attention to remove the residue on the concrete surface, especially the residual release agent on the concrete slab)

In the water absorption of the substrate or in high temperature, dry environment, before construction should be wet to the outside of the base surface dry wet state; for the substrate loose and strong water absorption, or surface dust is difficult to thoroughly clean the surface, can do interface treatment.
With the mission of "making all the big boards in the world stable", the tile glue adheres to the core concept of "sticking stably and not falling off", ingenious research and development, continuous improvement and continuous innovation, providing high-quality products and multi-faceted solutions for the decoration accessories market. At present, the products have been covered with paste, waterproof, base surface, repair, beauty seam, cleaning and other series.

The special adhesive for TDW-827 rock plate and large plate has strong permeability, can fully penetrate and infiltrate mortar base, effectively improve the bonding strength between mortar or putty and wall surface, improve the bonding force between putty and base material, enhance the compactness of base layer, improve the adhesion between layers, ensure the performance of wall coating, and prevent hollowing and falling off.