TDW-801 Sticks tile adhesive steadily
This product is a polymer modified cement-based tile adhesive, the product is ready to use with water, compared with the traditional cement mortar, the paving construction is simple, effectively saves space loss, saves labor and time, is non-toxic and harmless, and is healthy and safe for the pasting of various ground tiles or small bricks on the wall of ordinary mortar surface.
Executive standard:JC/T547-2017《Ceramic Tile Adhesive》C1
Tag list: TDW-801 Sticks tile adhesive steadily
Category:
Product Description
TDW-801 Stabilized Tile Adhesive is formulated with premium Portland cement,
inorganic binders, and refined aggregates.A powder-based eco-friendly tile adhesive
formulated with multiple functional additives, ready to use after simple water mixing.
For use with ordinary tiles that absorb more than 0.5% water, suitable for various
floor tiles on ordinary cement mortar surfaces.
The application of small brick pieces for wall cladding.
Scope of Application
- Directly applied to concrete, cement plastering, concrete slabs, plastered brick surfaces, and certain waterproof coatings; suitable for indoor and outdoor use.
- The water absorption rate of the wall is more than 0.5%.
- Specifications: Wall-mounted tiles (≤600*600mm) and floor tiles (≤800*800mm).
Technical Specifications
The product complies with the C1 standard of JC/T547-2017 "Adhesives for Ceramic Tiles", with the following key specifications:
| order number | surveillance project | qualification |
| 1 | Tensile bond strength/MPa | ≥0.5 |
| 2 | Bonding strength after immersion and stretching /MPa | ≥0.5 |
| 3 | Tensile bond strength after thermal aging /MPa | ≥0.5 |
| 4 | Tensile bond strength after freeze-thaw cycles/MPa | ≥0.5 |
| 5 | Bake time: 20 min, tensile bond strength/MPa | ≥0.5 |
Construction Operations
Standard Construction Process for Sticking Tile Adhesive

Material Estimation and Tool Preparation
| Key points of construction | Construction detail description |
| (1) Material estimation | Material usage: approximately 1.4-1.7 square meters per bag, depending on the tile size of the base surface. |
(2) Tool preparation | Testing tools: hollow drum hammer, laser, level, tape measure |
| Proportioning tools: electric mixer, mixing bucket, measuring cup | |
| Construction tools: toothed trowel, rubber mallet, tile vibrator, cross positioning card, leveling device (base, wedge, clamping pliers), brick support, diamond file, cloth, putty knife, putty knife, scraper, plumb line, ink cartridge, suction cup, tile cutter |
Primary Assessment and Management
| Key points of construction | Construction detail description |
(1) Basal hollowing | Inspection method: Use a hollow drum hammer to tap each construction base surface individually. Determine the scope of hollow drum by the sound's crispness or muffled resonance, and mark it accordingly. |
| Treatment method: If the base surface has hollow drumming issues, use an electric hammer to remove the hollow areas, then repair and smooth them with polymer mortar. | |
| Unaddressed risks: If the hollow-out areas are left untreated, subsequent structural layers (plastering, waterproofing, tiling, putty, etc.) may develop issues such as peeling, hollow-out, or cracking after completion or commissioning. | |
(2) Loose foundation with dust and sand erosion | Inspection method: Wear gloves or use a putty knife to repeatedly scrape and rub the substrate. Assess the looseness of the substrate based on the degree of dusting and sanding. |
process mode : 1) If dust or sanding is not noticeable at the base layer, first clean the surface with a broom, then apply the interface reinforcement agent. 2) When the base layer exhibits severe dust/sand accumulation and is loose, first use a cleaning spatula to remove surface debris until a solid base is achieved, then apply a reinforcement agent for interface consolidation. | |
| Untreated risk: The reinforcement agent typically penetrates 2-3 mm, but the excessive thickness of floating dust prevents adequate penetration. If the loose substrate with severe dust and sanding is not addressed, subsequent structural layers (plastering, waterproofing, tiling, putty, etc.) are prone to issues such as hollow drumming and peeling. | |
(3) Oil stains and protrusions at the grassroots level | Method of examination: observation |
| Procedure: Use a cleaning spatula to remove protrusions, particles, and oil stains from the base layer. | |
Unprocessed risk: 1) If particles and protrusions are not addressed, the finished surface may exhibit issues such as unevenness and protrusions after interface reinforcement. 2) If oil stains or the original wall putty layer are left untreated, the reinforcement agent cannot penetrate effectively, which will compromise the interface reinforcement performance. | |
(4) Surface flatness inspection at the grassroots level | Inspection method: Use a horizontal ruler to check the flatness and verticality of the base layer, with a deviation of 3mm within 2m using the ruler. |
process mode : 1) Perform reinforcement bar placement at designated points on the base layer for tiling 2) Apply leveling mortar for partial or full surface leveling Note: For the grout placement technique, please refer to the "Tile Laying Construction Manual". | |
Unprocessed risk: Uneven walls can affect the thickness of tile adhesive application. If the adhesive is too thick or too thin, tiles may fall off. Note: The recommended tile adhesive thickness for 801 tiles is 5-10mm. | |
(5) Inspection of pipeline trenching locations | Inspection method: Check whether the pipeline groove is properly filled and whether there are any issues of poor bonding. |
process mode : 1) Remove the sections of the pipeline where the groove is poorly bonded and delaminated. 2) Use polymer cement mortar to seal and compact the areas with inadequate filling or poor bonding. | |
| Unprocessed risk: Must be processed |
Material Proportion
| Key points of construction | Construction detail description |
| (1) Operation Steps | 1) Add water to an empty bucket according to the manufacturer's recommended ratio (approximately 4:1), then gradually incorporate the powder. |
| 2) Stir with an electric mixer for 2–3 minutes, let stand for 3–5 minutes, then stir again for 1–2 minutes. | |
(2) Notes | Note: 1) Add water before powder to ensure even mixing of the tile adhesive at the bucket bottom. 2) The prepared slurry must be used within 2 hours. 3) Once the mortar has solidified, it must not be re-mixed with water. |
Applying tile adhesive to walls or floors
| Key points of construction | Construction detail description |
(1) Operation Steps | 1) First, select an appropriate toothed trowel to apply a thin layer of prepared tile adhesive to the substrate, with the mortar thickness being less than 1mm. |
| 2) Apply a thick layer of tile adhesive to the base layer using a toothed trowel at a 45-60° angle, ensuring the surface is fully and evenly coated. Each application should not exceed 1m². | |
(2) Notes | 1) The scraper surface forms a 45-60° angle with the wall. |
| 2) During combing, apply sufficient pressure to ensure the scraper teeth reach the wall surface, resulting in uniformly high and full lines. |
Apply tile adhesive to the back of tiles
| Key points of construction | Construction detail description |
(1) Operation Steps | 1) Use a damp cloth to remove the release agent from the back of the tiles. |
| 2) Apply tile adhesive to the back of the tiles using a toothed trowel at a 45-60° angle to the surface. Then, smooth the adhesive into a uniform strip parallel to the base surface's grooves. | |
(2) Notes | 1) Failure to remove the release agent may cause brick detachment. |
2) For tiles larger than 300×300mm, grooves must be cut on the reverse side. For tiles measuring ≤300×300mm, apply a thin 2mm adhesive layer on the reverse side. |
Tile Laying
| Key points of construction | Construction detail description |
| (1) Operation Steps | Align the tiles with their backs facing the groove, ensuring they are offset from the wall's groove marks. Lay them parallel to the groove, then press firmly to expel air and achieve full adhesion. |
(2) Notes | 1) During the adjustment period of tile adhesive (20-30 minutes), the position and joints of tiles may be adjusted; if the allowable adjustment time is exceeded, moving the tiles is strictly prohibited. |
| 2) The thickness of 801 tile adhesive is approximately 5-10mm. | |
| 3) For tiles larger than 300×300 mm, electric vibrators may be used for compaction instead of manual kneading. |
nstallation/Removal of Leveling Device
| Key points of construction | Construction detail description |
(1) Operation Steps | 1) Install the leveling base: Position the base approximately 10-15cm from the tile edges. |
| 2) Inserting wedges: Embed wedges at the base of the leveler | |
| 3) Fixing and Leveling: Secure the leveling wedge with a clamping tool and level the tile surface. | |
| 4) Levelness inspection: Use a level gauge to check whether the tiles are laid flat. | |
| 5) Remove the leveling device: Use a rubber hammer to remove the leveling device and inspect the tile joints for any remaining tile adhesive. | |
(2) Notes | 1) If the tiles are uneven, pry them apart and re-lay them. |
| 2) When tile specifications or geometric shapes differ, make real-time cutting or trimming adjustments during installation to ensure uniform gap width. | |
| 3) When removing the leveling device, the striking direction must align with the brick joint orientation. | |
| 4) The leveling wedge can be reused |
Cleaning/Acceptance/Maintenance
| Key points of construction | Construction detail description |
| (1) Detection of hollow drum and cracks | The decorative tile project constructed with full-lay method shall be free from hollow drumming and cracks. Examination method: Observation; gentle percussion with a small hammer |
| (2) Surface Inspection of Laying | The types, specifications, patterns, colors, and performance of facing tiles must meet the design requirements. Inspection method: Observation; Review of product qualification certificates, on-site acceptance records, performance test reports, and retest reports |
(3) Detail Position Detection | The facing bricks around protruding wall elements should be cut and fitted as whole tiles with neat edges. The thickness of wall skirts and face-mounted protrusions extending beyond the wall surface should be uniform. Examination methods: observation; measurement |
Important Notes
Matters need attention
- The construction temperature is 5-35℃.
- The proportion of water and powder can be adjusted according to the substrate, weather and construction conditions.
- When working in rainy weather, implement proper shielding measures and ensure the construction area remains dry for 24 hours after tiling.
- The mortar should be used within 1 to 2 hours depending on weather conditions.
- Never re-mix dried glue slurry with water before use.
- After the tiling is completed, the mortar must be fully cured (approximately 24 hours) before proceeding to the next step of joint filling.
- When applying wall adhesive, ensure proper temporary fixation measures are implemented.
Quality guarantee period
- Unopened products shall be stored in a dry, cool, and well-ventilated place. Under normal storage and transportation conditions, the shelf life of the product is 12 months.
Safe code
- This product contains cement components which may irritate the eyes and skin. Therefore, it is essential to wear appropriate protective equipment during application. In case of accidental eye contact, immediately rinse with clean water and seek medical attention promptly.
- Important note: The factory-installed palletizing wrapping film and wooden base tray enhance product protection against water, dust, and moisture. Do not damage them before use (these items are not included for small quantities).
Disclaimer
- Please follow the instructions in the manual during construction. Our company shall not be liable for any losses caused by improper use.
- Before using the product, check the latest version of the package instructions or product manual.
- No separate notice will be given for any updates to the product manual.
- For inquiries, please contact your local distributor or our technical service department.
Previous Page
Next Page
Corporate Strengths Overview
Intelligent Manufacturing & Full Automation
A ¥30M+ smart factory integrates advanced automation and IoT-enabled traceability systems, aligning with China's "Manufacturing 2025" strategy.
Scalable Production & National Network
43 partner factories nationwide deliver 960K tons/year (solid) and 480K tons/year (liquid) capacity, ensuring rapid market responsiveness.
Core Data-Driven Systems
Four intelligent platforms (central monitoring, equipment management, dynamic KPIs, energy optimization) enable real-time production control and efficiency.
Quality & Capacity Synergy
Fully automated processes ensure product uniformity, while scalable output meets global demands, positioning TDW as a leader in smart manufacturing.
Related Product
TDW-I High-energy tile adhesive
TDW-100 Reinforced Waterproof Coating
TDW-888 Rubber Waterproof Paste
Related Product